This reason of this project is to supply AL-Busdaira area with clean water the total pipe line was 3500 M.L with 6 in D, the excavation work was 3500 M.L with 1 M depth and also to cover the pipe with clean river sand before burying it to the ground level and also the work include making main halls with valves for maintenance , we made a weekly report along the project time with photos for each step of the work and when the work was completed the people of AL-Busdiara area were happy because the clean water arrived to there houses which was a dream in the past period