ONE of OUR WORKS

AL-DALLAH BRIDGE

Project title AL-DALA BRIDGE PROJECT IN SALAH AL-DIN PROVINCE

Beneficiary side:ministry of municipality – directorate of Tikrit

Contract:31 / 2013

Location:salah al-din province – Tikrit – al-dala intersection

Contract amount:21,970,136,000 ID

Contract period:27 months

Description

The project  consist of two bridges (A) and (B) intersecting with each different two levels with a maximum height of the bridge (A) 17 meters and a maximum height of the bridge (B) 10 meters at their intersection point and the length of bridge (A) with approaches 1000 meters and a width of 11 meters It consists of 15 span (Box girder) length of 36 meters for each span total length of bridge (B) with approaches 875 meters width 8 meters and consists of 9 span (Box girder) length of 36 meters for each span with the development of the surrounding area of infrastructure (sewage rainwater, storm water, pure water network, power grid, lighting, optical network and voice communications) and pavements and roads as